WK Cover Method
(roof retrofit system)

Installation without drilling holes in the existing roof.
Prevent rain and dust from entering the building during construction.

We also offer roof repair services for conventional construction methods for buildings other than membrane structure buildings. The “WK Cover Method” introduced here is a method of constructing a new roof over the existing roof while maintaining operations.

Product & Service

Aesthetic and highly durable

Operation during construction

Business can continue to operate inside during renovation works.

No worries about leaks

The WK covering method is also extremely durable and leakage-free.

Reduced CO2 emissions

Electricity consumption is reduced and CO2 emissions are reduced.

Excellent thermal insulation effect

The roof is double-layered with the existing roof, providing excellent thermal insulation.

Reduced electricity costs

The increased insulation effect reduces electricity costs.

Longer service life

The use of highly weather-resistant materials prolongs the life of the building. (Guaranteed for up to 25 years).

Dustless Method

Our unique dust-free construction method, which uses special hardware, ensures that no dust falls inside the room, so you can work comfortably in a clean environment during the installation. No holes are made in the existing roofing material, so there is no risk of leakage due to rain during construction.

Safety Method

Steel safety sheet scaffolding eliminates the risk of accidents during work, such as stepping through. The safety construction method allows work to be carried out smoothly and significantly improves workability, such as shortening the construction period.

  • TOP>
  • Product>
  • WK Cover Method (roof retrofit system)