WK Cover Method
(roof retrofit system)
Installation without drilling holes in the existing roof.
Prevent rain and dust from entering the building during construction.
We also offer roof repair services for conventional construction methods for buildings other than membrane structure buildings. The “WK Cover Method” introduced here is a method of constructing a new roof over the existing roof while maintaining operations.
Product & Service
Aesthetic and highly durable
Operation during construction
Business can continue to operate inside during renovation works.
No worries about leaks
The WK covering method is also extremely durable and leakage-free.
Reduced CO2 emissions
Electricity consumption is reduced and CO2 emissions are reduced.
Excellent thermal insulation effect
The roof is double-layered with the existing roof, providing excellent thermal insulation.
Reduced electricity costs
The increased insulation effect reduces electricity costs.
Longer service life
The use of highly weather-resistant materials prolongs the life of the building. (Guaranteed for up to 25 years).
Dustless Method
Our unique dust-free construction method, which uses special hardware, ensures that no dust falls inside the room, so you can work comfortably in a clean environment during the installation. No holes are made in the existing roofing material, so there is no risk of leakage due to rain during construction.
Safety Method
Steel safety sheet scaffolding eliminates the risk of accidents during work, such as stepping through. The safety construction method allows work to be carried out smoothly and significantly improves workability, such as shortening the construction period.