Fukuoka Prefecture General national highway improvement road embankment work 3(1062)
- Location
- Fukuoka prefecture (Kyushu)
- Product/Material
- Rigid-wall embankment reinforced soil wall method "RRR-B method" KJV-30W, KJV-60W
- completion of construction
- October 2007
- scale
- 7,760 square meters