Hiroshima Prefecture, gymnasium construction work (1052)
- Location
- Hiroshima prefecture (Chuugoku area)
- Product/Material
- Rigid Wall Fill Reinforced Earth Wall Method "RRR-B Method" KJV-30W
- completion of construction
- August 2002
- scale
- 1,920 square meters