Construction of coastal submarine jetty and sand retaining embankment, Niigata Prefecture (978)
- Location
- Niigata prefecture (Hokuriku area)
- Product/Material
- Hybrid Mat" DT200 , a high-stretch mat with anti-absorption measures
- completion of construction
- August 2008
- scale
- 3,600 square meters