Osaka Pref. Infrastructure work for ancillary facilities to navigation channel 1(949)
- Location
- Osaka (metropolitan area)
- Product/Material
- Pollution Control Membrane "Silt Protector" Special Type Pile Type Lower
- completion of construction
- June 2013
- scale
- 702m (39SP)