Osaka Pref. Infrastructure work for ancillary facilities to navigation channel 2 (950)
- Location
- Osaka (metropolitan area)
- Product/Material
- Pollution Control Membrane "Silt Protector" Special Type Pile Upper
- completion of construction
- June 2013
- scale
- 702m (39SP)