Hiroshima Prefecture, sidewalk installation (877)

Hiroshima Prefecture, sidewalk installation (877)

Hiroshima Prefecture, sidewalk installation (877)

    Location
    Hiroshima prefecture (Chuugoku area)
    Product/Material
    Lightweight Embankment Method "EDO-EPS Method" Select Wall
    completion of construction
    October 2012
    scale
    DX-29, etc.; 25 cubic meters, wall surface approx. 26 square meters
  • TOP>
  • Projects>
  • Hiroshima Prefecture, sidewalk installation (877)