Ibaraki Prefecture Stormwater Culvert Load Reduction Work (856)

Ibaraki Prefecture Stormwater Culvert Load Reduction Work (856)

Ibaraki Prefecture Stormwater Culvert Load Reduction Work (856)

Ibaraki Prefecture Stormwater Culvert Load Reduction Work (856)

    Location
    Ibaraki prefecture (Kantou area)
    Product/Material
    Lightweight Embankment Method "EDO-EPS Method" DX-24H, DX-29, DX-35
    completion of construction
    December 2011
    scale
    307 cubic meters, 176 cubic meters, 163.4 cubic meters
  • TOP>
  • Projects>
  • Ibaraki Prefecture Stormwater Culvert Load Reduction Work (856)