Earth retaining work at foundation of temporary bridge for disaster restoration, Fukuoka Prefecture (839)
- Location
- Fukuoka prefecture (Kyushu)
- Product/Material
- Continuous box-type steel frame "MAXWALL" MW-1350
- completion of construction
- October 2017
- scale
- 300m