Hiroshima Prefecture Erosion control river revetment earth retaining wall construction (829)

Hiroshima Prefecture Erosion control river revetment earth retaining wall construction (829)

    Location
    Hiroshima prefecture (Chuugoku area)
    Product/Material
    Continuous box-type steel frame "MAXWALL" MW-1350
    completion of construction
    June 2019
    scale
    40m
  • TOP>
  • Projects>
  • Hiroshima Prefecture Erosion control river revetment earth retaining wall construction (829)