Hiroshima Metropolitan Park Athletic Stadium Hiroshima Big Arch

    design
    Higashihata Architects Office
    construction
    Obayashi Corporation & Matsumoto Construction JV
    Location
    Hiroshima City, Hiroshima Prefecture
    Product/Material
    Membrane structure TM truss (TTR)
    completion of construction
    1992
    Membrane Material
    Class B and C membranes (PVC-glass fiber, PVC-synthetic fiber)
    scale
    Large: 2,001 to 5,000 square meters
  • TOP>
  • Projects>
  • Hiroshima Metropolitan Park Athletic Stadium Hiroshima Big Arch