Storm surge control work on the Saruho River in the Ohta River system (Nippo 2 construction area)

Storm surge control work on the Saruho River in the Ohta River system (Nippo 2 construction area)

    donor
    Hiroshima Prefectural Western Construction Office
    Location
    Hiroshima City, Hiroshima Prefecture
    Product/Material
    Pollution Control Membrane "Silt Protector" Fixed Hanging Type C-500-3m
    completion of construction
    April 2016
    scale
    220m (11SP)
  • TOP>
  • Projects>
  • Storm surge control work on the Saruho River in the Ohta River system (Nippo 2 construction area)