Installation of water sealing membrane at Taketoyo Thermal Power Station intake of Chubu Electric Power Co.
- donor
- Chubu Electric Power Co.
- Location
- Taketoyo City, Aichi Prefecture
- Product/Material
- Pollution Control Membrane "Silt Protector" Fixed Hanging Type A-800-6m to 12.5m
- completion of construction
- March 2001
- scale
- 83m