FY 2008 No.1 Ise Bridge, Ibigawa River Lower construction

FY 2008 No.1 Ise Bridge, Ibigawa River Lower construction

    donor
    Hokusei National Highway Office, Chubu Regional Development Bureau
    Location
    Kuwana City, Mie Prefecture
    Product/Material
    Pollution Control Membrane "Silt Protector" Fixed Hanging Type A-500-2m, Fixed Freestanding Type 500-2m
    completion of construction
    May 2017
    scale
    420m(21SP)
    320m(16SP)
  • TOP>
  • Projects>
  • FY 2008 No.1 Ise Bridge, Ibigawa River Lower construction