Kumamoto Prefecture Final disposal site construction waterway and slope protection (764)

Kumamoto Prefecture Final disposal site construction waterway and slope protection (764)

    Location
    Kumamoto prefecture (Kyushu)
    Product/Material
    Cloth formwork "TACOM" Standard type 50H
    completion of construction
    June 2005
    scale
    190 square meters
  • TOP>
  • Projects>
  • Kumamoto Prefecture Final disposal site construction waterway and slope protection (764)