Wakayama Prefecture, Forestry Road Disaster Prevention Measures Mountain Control Project, Three-surface tensioned waterway construction (713)
- Location
- Wakayama prefecture (Kinki area)
- Product/Material
- Cloth formwork "TACOM" Standard type 150H
- completion of construction
- November 2014
- scale
- 250 square meters