Kyoto Prefecture Bridge Lower Construction Method Surface Protection Work (702)

Kyoto Prefecture Bridge Lower Construction Method Surface Protection Work (702)

    Location
    Kyoto (metropolitan area)
    Product/Material
    Cloth formwork "TACOM" Standard type 300H
    completion of construction
    June 2014
    scale
    550 square meters
  • TOP>
  • Projects>
  • Kyoto Prefecture Bridge Lower Construction Method Surface Protection Work (702)