Nagano Prefecture Landslide prevention three-surface tensioned channel construction (660)

Nagano Prefecture Landslide prevention three-surface tensioned channel construction (660)

    Location
    Nagano prefecture (Chuubu area)
    Product/Material
    Cloth formwork "TACOM" Standard type 150H
    completion of construction
    February 2013
    scale
    4,232 square meters
  • TOP>
  • Projects>
  • Nagano Prefecture Landslide prevention three-surface tensioned channel construction (660)