Mie Prefecture Waste treatment plant stormwater control slope protection work 2(597)

Mie Prefecture Waste treatment plant stormwater control slope protection work 2(597)

    Location
    Mie prefecture (Kinki area)
    Product/Material
    Cloth formwork "TACOM" Standard type 50H
    completion of construction
    August 2014
    scale
    1,074 square meters
  • TOP>
  • Projects>
  • Mie Prefecture Waste treatment plant stormwater control slope protection work 2(597)