Yamanashi Bridge Repair and Reinforcement Three-sided Waterway Stretching Work (550)

Yamanashi Bridge Repair and Reinforcement Three-sided Waterway Stretching Work (550)

Yamanashi Bridge Repair and Reinforcement Three-sided Waterway Stretching Work (550)

    Location
    Yamanashi prefecture (Chuubu area)
    Product/Material
    Cloth formwork "TACOM" Standard type 300H
    completion of construction
    September 2013
    scale
    250 square meters
  • TOP>
  • Projects>
  • Yamanashi Bridge Repair and Reinforcement Three-sided Waterway Stretching Work (550)