Fukushima Repair of cave-in gate and protective covering for falling rocks and snow (523)

Fukushima Repair of cave-in gate and protective covering for falling rocks and snow (523)

    Location
    Fukushima prefecture (Tohoku area)
    Product/Material
    Cloth formwork "TACOM" Standard type 50H
    completion of construction
    March 2018
    scale
    391 square meters
  • TOP>
  • Projects>
  • Fukushima Repair of cave-in gate and protective covering for falling rocks and snow (523)